Posted on Categories Water, WildlifeTags , , , , , , ,

Fishery groups plan to sue PG&E over Potter Valley plant and related Scott, Cape Horn dams

Mary Callahan, THE PRESS DEMOCRAT

A coalition of fishery groups has formally notified PG&E that it plans to file suit under the Endangered Species Act, alleging the continued injury to once abundant federally protected salmon and steelhead trout as a result of operations at the utility’s aging Potter Valley powerhouse.

The legal maneuver is part of an effort to expedite removal of Scott and Cape Horn dams, which pose a threat to vulnerable fish species in the Eel River and block access to hundreds of miles of prime habitat upstream.

The plaintiffs contend that last Thursday’s expiration of PG&E’s license for the project means the utility is no longer protected from liability and must be found in violation of the Endangered Species Act — a point the utility disputes.

A formal notice filed Friday by the coalition gives PG&E 60 days to remedy the situation or face litigation. It also echoes comments about project inadequacies made in a March 16 letter from the National Marine Fisheries Service to the Federal Energy Regulatory Commission in advance of the expiration of the utility’s license.

Read more at https://www.pressdemocrat.com/article/news/fishery-groups-plan-to-sue-pge-over-potter-valley-plant-and-related-scott/

Posted on Categories Water, WildlifeTags , , , , , , , , ,

Russian River flows at risk: New studies show potential path forward for Potter Valley project

Mother of All Groups (MOAG), SONOMA COUNTY GAZETTE

PG&E’s license to operate the Potter Valley Project expires in April of 2022. For more information until then: http://pottervalleyproject.org/

A group of studies released last month paint a clearer picture of how Sonoma and Mendocino counties can meet future water needs while reducing environmental impacts in the face of a decision by PG&E to cease operation of an aging hydroelectric power project.

The Potter Valley Project (PVP) is located approximately 15 miles north of the City of Ukiah on the Eel River. The Project’s facilities include two dams, a diversion tunnel and a hydroelectric plant located in Potter Valley in the headwaters of the Russian River. The 100-year-old project produces little electricity by modern standards and is a net money loser, but Sonoma and Mendocino County water users have grown accustomed to the water diverted by the Project which flows from the Eel River into the Russian River watershed where it is stored in Lake Mendocino – ultimately flowing down the Russian River where it benefits agricultural interests and residents.

This arrangement was put in jeopardy when PG&E announced in 2019 that it would not seek to renew its federal license to operate the Project, which expires in April 2022. In recent weeks, PG&E also notified the public that the Project’s powerhouse had suffered a transformer failure, which eliminated its ability to generate electricity and reduced water diversions into the Russian River. Given PG&E’s goal to dispense with the Project, it is unlikely the powerhouse will be repaired or that the Project will ever function as it once did.

In response to PG&E’s decision to divest from the Project, a diverse group of stakeholders called the Two-Basin Partnership was formed to develop a plan to take over and modify the Project in a way that reflects regional needs and priorities in both basins. Among these priorities are fisheries recovery in the Eel River – one of the few major rivers left in California that has the potential to support abundant, self-sustaining wild populations of salmon and steelhead – and water supply reliability for Russian River water users. The Partnership’s proposed plan included the removal of Scott Dam, restoration of the drained Lake Pillsbury footprint and modifications or the replacement of Cape Horn Dam to maintain a diversion.

Read more at https://www.sonomacountygazette.com/sonoma-county-news/russian-river-flows-at-risk-new-studies-show-potential-path-forward-for-po/

Posted on Categories WaterTags , , ,

Upper Russian River flow decisions being delayed

Rollie Atkinson, SOCONEWS

The long-term picture for reliable water flows in the Russian River, above Healdsburg to Mendocino County, will remain uncertain for at least two more years, if not longer. The hold up stems from ongoing studies and multi-agency negotiations over the future of the Scott Dam on the Eel River and the century-old Potter Valley Project (PVP) that diverts Eel River water into the Russian River and Lake Mendocino.

On Sept. 2, the five-member Two-Basin Partnership asked the Federal Energy Regulatory Commission (FERC) for a one-year abeyance to continue evaluations of a proposed takeover of the PVP from Pacific Gas and Electric (PG&E) which has announced it will not renew its FERC permit after 2022. The Two-Basin Partnership is seeking removal of the Scott Dam but continued Eel River diversions into the East Fork of the Russian River. The proposal would add 288 river miles of access to salmon and steelhead while assuring an annual diversion of 62,500 acre/feet of water.

The partnership is citing a shortage of funds to operate the PVP and said last week “we have made substantial efforts but have not yet secured public and philanthropic funds for that work.” In May, PG&E declined to fund the project and by statute the utility is barred from seeking a new license.

Read more at https://soconews.org/scn_county/upper-russian-river-flow-decisions-being-delayed/article_a91725c4-1bbf-11ec-8e56-e7467a39b2f4.html?

Posted on Categories WaterTags , , , , ,

Limbo for Mendocino County water transfer clouds outlook for key Russian River source

Mary Callahan, PRESS DEMOCRAT

The Russian River’s sprawling, manmade delivery system for drinking and irrigation water has for decades relied on a share of the flow in the Eel River, miles to the north in Lake County.

In years past, up to 22 million gallons have been siphoned from the Eel through a system of pumps, pipes and reservoirs and sent south into the East Fork of the Russian River through a mile-and-a-half tunnel blasted into a mountain more than a century ago.

But the future of that cog in the Russian River machine, long seen as critical for farmers, ranchers and rural residents reliant on the river in Mendocino County and northern Sonoma County, is now in limbo.

The water transfer also has generated hydroelectricity as it passed through a small powerhouse in rural Potter Valley and on into Lake Mendocino near Ukiah.

Efforts by federal fisheries regulators to bolster declining salmon and steelhead runs in the Eel River have slashed those diversions in half since 2007. And the drought cut those diversions by another fifth this year, as water regulators seek to maintain supplies in Lake Pillsbury, formed by a dam across the Eel River.

They may be eliminated permanently in the future as a result of PG&E’s decision not to renew its license for the 113-year-old Potter Valley powerhouse when it expires next year, leaving the state of all water transfers from the Eel River uncertain.

Read more at https://www.pressdemocrat.com/article/news/limbo-for-mendocino-county-water-transfer-clouds-outlook-for-key-russian-ri/

Posted on Categories Water, WildlifeTags , , , , ,

Eel River to some, Wiya’t to the tribe that fishes it

Arthur Dawson, PRESS DEMOCRAT

The Eel River runs through Lake, Mendocino, and Trinity counties before reaching the Pacific Ocean in southern Humboldt County. Its name was given by Josiah Gregg in 1850 as he was exploring and looking for land to settle. Coming upon a group of Indigenous Wiyot fishermen, he traded a frying pan for some Pacific lampreys, which he mistook for eels.

Those Wiyot fishermen had probably been up most of the night — a good time for catching lamprey. Some of the best fishing spots were in the breaking waves at the river’s mouth. Waving redwood-splinter torches over the water, they attracted the lamprey with the flames. With quick reflexes and a carved stick, they snatched them from the water. And because lampreys are so slippery, the Wiyot twirl them over their heads before setting them on dry ground — otherwise they can slide off back into the river.

Read more at https://www.pressdemocrat.com/article/news/eel-river-to-some-wiyat-to-the-tribe-that-fishes-it/

Posted on Categories Agriculture/Food System, Habitats, Water, WildlifeTags , , , , , , ,

Scott Dam slated for removal in plan by Sonoma County and partners to control hydropower project

Guy Kovner, THE PRESS DEMOCRAT

Enviro Updates: From the Eel River Action Plan 2016, by California Trout: “The Eel River is the third largest river entirely in California.The Eel River ecosystem, its salmon and steelhead populations, and other native fish and wildlife populations have been in decline for the past century and a half. It has been transformed from one of the most productive river ecosystems along the Pacific Coast to a degraded river with heavily impaired salmonid populations.”

A nearly century-old dam on the Eel River that impounds Lake Pillsbury is slated for removal under a $500 million proposal helmed by Sonoma County and four other regional partners seeking to take over from PG&E a remote but pivotal hydropower project in Mendocino County.

The coalition, including Mendocino and Humboldt counties, hailed the proposal as a milestone in their effort to meet the needs of all three counties, protecting water supplies for farmers, fish and communities, including a key source of supplemental water for the Russian River system that serves 600,000  customers in Sonoma and Marin counties.

The dam removal alone, a long-sought goal of environmental groups and fish advocates, would be the highest-profile project to improve habitat for imperiled North Coast salmon and steelhead in decades, perhaps behind only the dam removals planned on the Klamath River within the next two years.

“The good news is that Scott Dam is coming out,” said Scott Greacen, conservation director for Friends of the Eel River, a nonprofit that for decades has been pursuing removal to open up more than 300 miles of spawning habitat in the upper Eel. Due mainly to dams, water diversion and other development, the river’s salmon and steelhead “have paid a devastating price, going from a million fish a year to the brink of extinction,” he said.

The proposal, submitted Wednesday to federal officials, has also stirred passions among those dismayed by the prospective loss of a 2,300-acre recreational lake deep in the Lake County portion of Mendocino National Forest. Santa Rosa residents George and Carol Cinquini, who have held a cabin at Lake Pillsbury since the 1940s, are annoyed that the 450 homeowners, ranchers and small business owners in the lake community were excluded from the planning process.

“We tried to get our foot in the door,” said Carol Cinquini, vice president of the Lake Pillsbury Alliance, which was formed last year.

“We’re very upset,” said George Cinquini, an alliance board member. The reservoir, about two hours from Santa Rosa is a haven for water sports, and without it, Cinquini warned, Russian River flows will be diminished in dry years.

But North Coast Rep. Jared Huffman, D-San Rafael, who brought local shareholders together to chart the project’s future, said the proposal is the only way to guarantee a “really important water resource” for the Russian River.

The 98-year-old dam has long outlived its purpose, he said, and the coalition project, dubbed the Two-Basin Partnership, calls for habitat restoration “to rejuvenate one of our great salmon rivers in California.”

State Sen. Mike McGuire, D-Healdsburg, whose district stretches across both drainages, called for Lake County to be added to the partnership because Lake Pillsbury and most of the Eel River’s headwaters are in the county.

Read more at https://www.pressdemocrat.com/news/10960029-181/sonoma-county-backs-plan-to

Posted on Categories Water, WildlifeTags , , , , , ,

Will overhauling Scott Dam save native fish?

Alastair Bland, THE BOHEMIAN

Salmon three feet long seem to clog the water as the chrome-colored fish, fresh from the ocean, begin their journey upriver toward the high-elevation gravel riffles where they were born. Here, in the remotest tendrils of the watershed, they will lay and fertilize the eggs that ensure the next generation of salmon.

At least that’s how it once was early each autumn on the Eel River. But nature’s security system for fish survival is only as good as the health of a river. In the case of the Eel, a local power company built a dam on the Eel’s main fork in 1920. As a result, Chinook salmon lost access to about 100 miles of spawning habitat.

Steelhead, which swam farther upstream into smaller tributaries, suffered even greater impacts. Intensive in-river commercial fishing, water diversions, logging and other land degradation took their toll, too. Today, annual salmon runs in Eel River that once may have totaled a million or so adults consist of a few thousand. Lamprey eels, too, have dwindled.

Now, there is serious talk of removing Scott Dam, owned by PG&E since 1930.

For fishery proponents, such a river makeover is the optimal way to revive the Eel’s salmon runs.

“We want to see volitional passage, both ways,” says Curtis Knight, executive director of the conservation group California Trout.

Volitional, in this context, means the salmon are able to make their historic migration on their own—downstream as newly born juveniles and, later, upstream as sexually mature adults—all without the assistance of human hands.

“We think dam removal is one possibility here,” Knight says.

California Trout is one of several local groups and agencies now formally considering taking over the operation of Scott Dam from PG&E. As a hydroelectric facility, Scott Dam is not very productive, and with PG&E’s operating license scheduled to expire in 2022, the utility giant recently stepped away from the project. PG&E even briefly put the Potter Valley Project up for auction, though the offer attracted no takers.

Read more at https://www.bohemian.com/northbay/saving-salmon/Content?oid=9360901

Posted on Categories Water, WildlifeTags , , , , , , ,

Sonoma County considering taking over Eel River water-power project

Guy Kovner, THE PRESS DEMOCRAT

Sonoma County supervisors agreed Tuesday to study the possibility of applying for a license to operate a remote Mendocino County hydropower project, marking the first move to maintain a long-standing water transfer deemed critical to residents and ranchers in both counties.

A coalition of five Mendocino County agencies and California Trout, a 50-year-old environmental nonprofit, are collaborating with Sonoma County’s water agency in the consideration of taking over the federal license for the Potter Valley Project, which delivers 20 billion gallons of water a year from the Eel River into the Russian River basin.

Each of the three partners is putting $100,000 into the study, an amount dwarfed by the potential cost of establishing free passage for the Eel River’s protected salmon and steelhead — likely a requisite step to extend the project’s life.

PG&E, the state’s largest utility now in bankruptcy, surrendered the project in January, upending the license renewal process, and no entity has responded to a Federal Energy Regulatory Commission (FERC) call for a new operator.

The utility, which had owned the project since 1930, said it was no longer economical to operate a plant that generated less than 1 percent of its power.

But the water flowing through the powerhouse is virtually invaluable to the towns and ranches along the upper Russian River from Potter Valley to Healdsburg and is a critical source for Sonoma Water, which delivers water to 600,000 Sonoma and Marin county customers.

Read more at https://www.pressdemocrat.com/news/9598819-181/sonoma-county-supervisors-eye-future

Posted on Categories WaterTags , , , , , , ,

CalTrout wants old Scott Dam on Eel River removed to help salmon and steelhead

Guy Kovner, THE PRESS DEMOCRAT

A state environmental group is calling for the removal of an old dam on the Eel River, contending it threatens the future of protected salmon and steelhead while acknowledging it is a key part of the North Bay’s water supply.

Scott Dam, a 138-foot concrete dam erected in 1922, is one of five aging dams California Trout asserts are “ripe for removal” to benefit their natural surroundings and communities.

The nearly 50-year-old nonprofit known as CalTrout said in its report, “Top 5 California Dams Out,” the Eel River represents “perhaps the greatest opportunity in California to restore a watershed to its former abundance of wild salmonids.”

Scott Dam, located in Lake County’s portion of the Mendocino National Forest, has been a longstanding target of other groups, including Friends of the Eel River, who want steelhead, coho and chinook salmon to swim freely within the 288 miles of habitat in the Eel watershed blocked by the dam.

The environmentalists see a “unique opportunity” to achieve their goal, as California’s largest utility PG&E, which has owned the dam as part of a small hydropower project since 1930, has filed Chapter 11 bankruptcy and abandoned plans to sell or seek relicensing of the project that diverts 20 billion gallons of water a year from the Eel to the Russian River at Potter Valley.

Eel River interests have considered the diversion a form of theft, while the water is critical to towns and ranches on the upper Russian River from Potter Valley to Healdsburg and part of the water supply for 600,000 residents in Sonoma and Marin counties.

How the future of the Potter Valley Project will play out over the next 18 months to two years is unclear, but it appears likely to result in either decommissioning or relicensing of the project, which includes a small powerhouse and two Eel River dams.

The bottom line is either PG&E or a new owner of the project may face a choice between paying more than $90 million for a fish ladder at Scott Dam or about $70 million to remove it.

Read more at https://www.pressdemocrat.com/news/9312399-181/state-environmental-group-wants-old

Posted on Categories Water, WildlifeTags , , , , ,

PG&E announces withdrawal from Potter Valley Project relicensing and auction process

CALIFORNIA TROUT

PG&E announced last week that it was withdrawing from the Federal Energy Regulatory Commission (FERC) relicensing process as well as the effort to sell the Potter Valley Project.  California Trout has been engaged in both proceedings and are hopeful this development will create a favorable environment to continue working towards a two-basin solution. 

From Pacific Gas and Electric:

Today PG&E submitted a letter to the Federal Energy Regulatory Commission providing our “Notice of Withdrawal of Notice Of Intent to File License Application and Pre-Application Document” for the Potter Valley Project.  As a result, PG&E will expeditiously cease all activities related to the relicensing of the Project.  Our decision to cease Project relicensing will also result in the stoppage of our efforts to sell the Project via the Request for Offers (RFO) process.

Although the timing is unclear at this point, we anticipate that PG&E’s action will result in FERC initiating its Orphan Project process.  In accordance with the Orphan process, FERC will provide interested parties the opportunity to submit an application for a new Project license.  We believe this path will allow interested parties more time to prepare for the acquisition of the Project and the ability to submit a License Application on their own terms rather than assuming PG&E’s current application.  If the Orphan process does not result in the issuance of a new Project License, it is expected FERC will order PG&E to prepare and submit a Surrender Application and Decommissioning Plan.

Source: Email from California Trout, read more about the Potter Valley Project at: https://caltrout.org/regions/north-coast-region/keystone-initiative-eel-river-recovery/potter-valley-project-and-ferc-relicensing/